GeorgeRequest a quoteQuote

Custom Staircase Manufacturing Process

George Design & Construction Co., Ltd. supplies custom staircases and railings made to buyers’ drawings. George Group was established in 2006. George is a one-stop building materials supplier in China, based in Foshan. The stages below run from the first enquiry to delivery.

Request a quotation

Upright wood panel beside stacked stock

Starting an Enquiry With Drawings, Photos and Dimensions

Most enquiries begin with a drawing, a photograph of an existing staircase or a sketch of the stairwell, together with the floor-to-floor height and the space available for the flight. For a straight flight, the rise and going of each step and the overall width help George plan and price the work. Contractors can send CAD files or PDF drawings; home owners can send photographs and a simple dimension sketch. Marking the parts of the staircase that matter, such as stringers, treads, landings and the railing line, shortens the first reply.

Clarifying Needs and Budget Before a Rough Quotation

For customised stairs, George’s sales team first clarifies the buyer’s needs and budget before giving a rough quotation. The team asks how the staircase will be used, how many flights are involved, which finish the buyer expects and where the goods will be delivered. There is no minimum order quantity for custom straight staircases, so a single flight and a multi-unit order follow the same enquiry route. George has served 100+ countries, and enquiries arrive from home owners, builders and distributors alike.

Drawings and Material Selection

Once the rough quotation is accepted, the drawings and the materials are settled. Staircase type shapes everything after it: a spiral staircase fits a tight footprint, a floating staircase uses concealed support, and a curved staircase needs a generous opening. Treads and risers can be timber, stone or metal, and the balustrade can be glass, metal or wrought iron with a matching handrail. George offers whole-house design, so staircase and railing finishes can be aligned with the rest of the interior. George has a 10,000-square-meter showroom in Foshan where buyers can compare samples.

Production Time for Custom Staircases

Typical production time for a custom staircase is 4–8 weeks, depending on the complexity of the design. Production lead time for a custom floating staircase typically ranges from 4 to 6 weeks, depending on the complexity of the design and the materials selected. Designs with many curved parts, mixed materials or intricate railing work take longer than a straightforward flight. Buyers scheduling site work, lifting equipment or installation crews can plan around these windows when they confirm the order details in the quotation.

Quality Checks Through Production and Loading

George’s quality control team checks materials and products through production and loading. Buyers who want particular checkpoints, such as measuring frame dimensions before finishing or photographs of finished sections before packing, can agree them with George in the quotation. Packing is planned around the staircase type and the shipping method, with frames, treads and railing parts protected for the journey by sea or road. The quality control page describes how the workshop handles materials and finished parts.

Numbered Components, Installation Guidance and Code Notes

Custom straight staircase components are numbered and shipped with a detailed installation guide. The numbers follow the agreed drawings, so a fitter can match each stringer, tread and railing part to its position on site, and straight staircases are commonly erected by a local crew from that guide. For any staircase type, the project’s designer and the authority having jurisdiction interpret federal ADA requirements, model codes such as the IRC and IBC, and local amendments. Exterior stairs may carry different requirements from interior stairs.

How an order runs

Send your project details
Drawings or reference photos, floor-to-floor height or run length, the materials and finish you prefer, the quantity and the delivery country.
Needs, budget and rough quotation
For customized stairs, the George sales team first clarifies your needs and budget before giving a rough quotation.
Drawings and material selection
Design details and materials are agreed on the drawings before production starts.
Production time
Typical production time for a custom staircase is 4–8 weeks, depending on the complexity of the design.
Quality checks
The George quality control team checks materials and products through production and loading.
Payment and delivery terms
Payment and delivery terms are confirmed in the quotation.

Request a quotation

Tell us the staircase or railing type, the floor-to-floor height or run length, the materials you prefer and the quantity.

Or write to sales@staircasesupplier.com

* Required